ADU stands for Accessory Dwelling Unit. It's a small, separate home on the same lot as your house, with its own front door, kitchen and bathroom. Families use one for a parent, a grown child, or rental income.
Typical sizes. Every design is sized to your lot and your town's limit, and setbacks and zoning are checked with the town before the price is final.
How large can it be?
Both states changed their rules in 2025. Most single-family homes can now add one ADU without a special permit or a hearing.
In Massachusetts, an ADU can be up to half the size of the main house, so house size matters here.
Your ADU can be up to
950 sq ft
What fits
Sample sizes. Your design can be any size up to the limit.
New Hampshire
In effect since July 1, 2025
Your town still has its own permit steps, septic rules and setbacks. We review yours during the consultation. Summary of state law as of November 2026; not legal advice.
Help paying for your ADU
State agencies, utilities and lenders offer loans, rebates and free resources that can lower the cost. Ask us at your consultation which ones fit your project.
Massachusetts
ADU Loan Program
MassHousing, through partner banks
Up to $250,000 for a detached ADU, or $150,000 for an attached one
A fixed-rate second mortgage that pairs a regular loan with a 0% interest, deferred portion, which lowers the overall rate.
For income-eligible owners of a single-family home they live in. Plans and permits must be done before you apply.
Good to know. New Hampshire doesn't have a state ADU grant or loan yet; bills to create one did not pass in 2026. The federal tax credits for heat pumps and solar ended for equipment installed after December 31, 2025. Programs change, so confirm current terms with each program before you apply. Information checked November 2026.
What's new for ADU owners
New laws, rules and money that make it easier to build an ADU in New Hampshire and Massachusetts. We check official state and agency sources every month and add anything that helps homeowners.
MassachusettsFinancing
0% loans for caregiving ADUs
Massachusetts' Home Modification Loan Program offers 0% interest loans of up to $50,000 to build an ADU for a multigenerational caregiving arrangement.
Massachusetts' new ADU Incentive Program connects homeowners with approved professionals for a feasibility study of their property. There's no obligation to build.
A new New Hampshire law (HB 1079) allows ADUs inside or attached to certain existing buildings that don't meet today's zoning, such as an older garage or barn.
Income-eligible Massachusetts homeowners can get a fixed-rate second mortgage of up to $250,000 for a detached ADU, or $150,000 for an attached one, through partner lenders.
Checked against official sources every month. This is general information, not legal advice, so confirm details with your town or the program before you apply.
From first visit to move-in
One team throughout. Construction takes about 3 months.
Consultation
We visit, walk the property with you, and review setbacks, septic and utilities. You learn what is possible.
Design, price and financing
Choose a layout and finishes. You receive a written price before any work begins, and we help you line up financing.
Permits
We prepare the plot plan, floor plans and energy forms your town requires, and manage the permit.
Construction
Foundation to finish, with one point of contact and regular updates.
Move in
Final inspection, occupancy permit, and a walkthrough before we hand you the keys. Your 1-year warranty starts that day.
Inside the 3 months of construction
A typical schedule once the permit is issued. Weather and inspection dates can move it a little.
Weeks 1 to 3Site work and foundation
Clearing, excavation, utility trenches and the foundation.
Weeks 4 to 6Weather-tight shell
Framing, roof, windows and doors, so work goes on in any weather.
Weeks 7 to 11Systems and interior
Plumbing, wiring, heating, insulation, walls, kitchen and bath.
Weeks 12 to 13Inspection and keys
Final inspections, the occupancy permit and your walkthrough.
If you own a single-family home, very likely. Both states now require towns to allow one ADU by right on single-family lots. Your town still applies its own setbacks, height limits and septic rules, so the first step is a free consultation at your property.
How large can it be?
In New Hampshire, up to 950 sq ft unless your town allows more, and towns can't set the limit below 750 sq ft. In Massachusetts, up to 900 sq ft or half the size of your house, whichever is smaller. Try the size calculator.
Should I build an ADU or an addition?
An ADU is a separate home with its own front door, kitchen and bathroom, so each household keeps its own routine, and it can be rented later where your town allows. An addition adds rooms to the main house and shares its kitchen and entrance. It usually costs less, and suits someone who needs care around the clock under the same roof. An attached in-law suite gives you some of both.
Can my town say no?
Not if the ADU meets the rules. In both states, one ADU on a single-family lot is allowed by right, so towns can't require a special permit or a public hearing for it. They can still set reasonable rules, like setbacks, and you still need a building permit.
Does the ADU need its own septic system?
Often it can share yours, as long as your system is sized for every bedroom on the lot. In Londonderry, for example, if the total bedrooms including the ADU are more than your septic plan allows, a new septic design is required. We review this at the consultation.
Can it have its own electric meter?
In New Hampshire, yes: towns can't deny a separate electrical panel and service for an ADU. In Massachusetts it depends on your town and utility, and we'll find out for you.
Can I sell the ADU separately later?
Usually not. In New Hampshire, selling an ADU separately from the main house as a condo isn't allowed unless your town permits it. Plan on the ADU staying part of your property.
What does an ADU cost?
It depends most on the type. Converting a garage or basement usually costs less than building a new cottage, because the structure already exists. After the consultation, we give you a price range for your property.
Are there grants or incentives for ADUs?
Yes, especially in Massachusetts, where MassHousing offers ADU loans of up to $250,000 and the state's Home Modification Loan Program offers 0% loans of up to $50,000 for families building an ADU for an older adult. In New Hampshire, NHSaves offers incentives for energy-efficient new homes. See all programs.
What can add to the cost?
Mostly what's in the ground. Ledge that has to be removed, long runs for water, sewer or electric lines, a septic upgrade, or a sloped yard can all add cost, as can your choice of finishes.
How do families pay for an ADU?
Common ways are a home equity loan or line of credit, a cash-out refinance, a construction loan, or savings. Some families share the cost with the parent who will live there, for example from the sale of their house. A local lender can advise on your situation.
Will my property taxes go up?
Probably somewhat, because an ADU adds value to your property and your town will assess it. Your town assessor can give you an estimate before you build.
Can my parent stay if they need more help later?
That's what we design for. One-level living, a step-free entry, generous doorways and a bath ready for grab bars mean the cottage keeps working as needs change, including visits from a home health aide.
Can we rent it out later?
Usually, yes. New Hampshire towns can't require the person living in the ADU to be a relative. Massachusetts towns can't require you to live on the property for a by-right ADU. Some towns limit short-term rentals, so we check yours.
Will it be warm enough in winter?
Yes. We build ADUs as full year-round homes to state building and energy codes, insulated and heated for New England winters.
Is there a warranty?
Yes. Every ADU we build comes with a 1-year warranty, starting the day you move in. We have been in business for over 40 years, and we are a phone call away if anything needs attention.
How long does it take?
Construction takes about 3 months. Design and permits come first, and how long they take depends on your town. The season and the type of ADU can also make a difference.
Do you handle the plans and permits?
Yes. We prepare the plot plan, floor plans and energy forms your town requires, file the permit, and meet the inspectors.
Can I choose my own layout and finishes?
Yes. Start from one of our designs, or bring a plan you like. We'll help you choose finishes that are beautiful and easy to live with.
Do you work in Massachusetts?
Yes. We build within about 20 miles of Londonderry and Salem, NH, including Methuen, Lawrence, Andover, Haverhill, Dracut and nearby towns.
How do we begin?
Book a free consultation or call us. We'll visit, answer your questions in person, and tell you what your property can hold.
No questions match that. Try another word, or call us and ask.